Wholesale data center capacity for hyperscalers, GPU clouds, and AI labs. Dedicated halls and multi-MW leases, 150 kW+ racks, 480 VAC or 800 VDC, first power H2 2027.

WHOLESALE CAPACITY · ENERGIZED H2 2027

YOUR CLUSTER IS READY. THE CAPACITY ISN'T.

Vacancy is near zero and delivery dates keep slipping. We lease dedicated halls and multi-MW capacity in facilities we develop, build, and operate ourselves, ready for 150 kW+ racks and commercial terms matched to your ramp. First power is H2 2027. On-site generation and grid supply are selected per site to hold that date.

THE HARDWARE SHIPS ON TIME. THE HALL DOESN'T.

New capacity in primary markets is preleased years out, and utility interconnection for large new loads typically runs five to seven years. We develop energized data halls around your deployment schedule, using on-site generation and grid supply where each fits. Your lease covers the finished, operated facility, with first power in H2 2027.

ON-SITE, GRID, OR HYBRID. SELECTED FOR THE SITE.

THE TERMS YOUR ENGINEERS SCREEN FOR.

Hyperscale is our specialty. Our team has spent decades designing, building, and operating hyperscale infrastructure, and one operator stays accountable from power through the IT load.

DEDICATED HALLS AND MULTI-MW LEASES

Suites, full halls, or whole buildings, with expansion rights on the same campus.

150 KW+ PER RACK

Air through direct-to-chip liquid cooling, 800 VDC or 480 VAC distribution.

N TO 2N REDUNDANCY

Set by your SLA, Tier II through Tier IV design, Level 1 through Level 5 commissioning.

BILLING THAT FITS THE LOAD

All-in pricing or reservation plus usage, tailored to your term and ramp.

24/7 OPERATIONS

Staffed around the clock, SLA-backed uptime, remote hands on site.

ONE LEASE. ONE ACCOUNTABLE OPERATOR.

Your contract is for an energized, operated data hall. Behind it, we integrate the site, power strategy, distribution, cooling, and operations. Buyers who want to own more of the stack can take a powered shell or power-only structure instead, with the same interface accountability.

FUEL SUPPLY

For sites using on-site generation, natural gas supply is secured and managed as part of the project, by pipeline or trucked delivery.

POWER SUPPLY

On-site natural gas generation, grid supply, or a hybrid of both, selected to the site and your delivery requirements. On-site systems are sized to the load and scaled in modular blocks, with redundancy from N through 2N.

POWERED SHELL

Building envelope, busbar distribution, cooling infrastructure, and connectivity. Energized and ready for your fit-out.

DATA CENTER

Modular construction for rapid deployment or traditional construction, selected to your preferences and project requirements. Engineered from Tier II through Tier IV, with 24/7 operations, SLA-backed capacity contracts, and uptime management. Lease it as wholesale colocation, priced all-in or as reservation plus usage, or take it as a build-to-suit handover. You bring the workload.

Facility hardware breakdown →

COMPUTE & GPU

Optional server and GPU procurement, plus cluster operations on Stellenium-operated infrastructure, built for 150 kW+ racks and covered by the same SLA.

TWO POWER PATHS. YOUR CHOICE.

We build on conventional 480 VAC or 800 VDC, chosen per tenant. 480 VAC is proven, familiar topology your operations team already knows, and Tier IV certifiable. When your racks are built to NVIDIA Vera Rubin or OCP Mt. Diablo standards, we can deliver 800 VDC to the building entry and collapse five conversions to two.

An on-site battery, sized to your load, rides a parallel branch through a bidirectional converter. It manages fast workload swings and provides recovery margin. On the DC path, a dedicated inverter feeds 480 VAC facility loads. Each segment is its own electrically isolated fault domain, configured from N to 2N by your SLA. Deployments scale by segment as your leased capacity ramps.

BUILT FOR TENANTS WHO CAN'T SLIP A DATE

HYPERSCALERS

Region and cluster expansions that need energized capacity on a committed date, at 150 kW+ rack density.

GPU CLOUDS

Capacity that matches signed customer contracts, with billing that tracks the ramp.

AI LABS & ENTERPRISE HPC

Training clusters that need a dedicated hall, liquid cooling, and one operator answering for uptime.

WHERE WE BUILD

We offer exclusive sites, access to a broad partner network, and site sourcing tailored to your capacity, delivery, connectivity, and expansion requirements. We can deploy globally, with a focus on North America, Europe, the Middle East, Southeast Asia, and Africa. Five criteria guide site selection.

FIBER AND LATENCY

Diverse fiber routes and network reach that fit the tenant's workload.

DELIVERABLE POWER STRATEGY

On-site generation, grid supply, or a combination, matched to your delivery date and ramp.

PERMITTING POSTURE

Jurisdictions with workable air and land-use permitting timelines.

COMMUNITY-FRIENDLY FOOTPRINT

Air-cooled, zero process water draw, contained acoustic profile.

SCALE HEADROOM

Room to grow from first power to campus scale without re-permitting.

WHAT TENANTS ASK US FIRST

TELL US THE MW AND THE DATE. WE'LL TELL YOU IF WE CAN HIT IT.

Capacity is committed in the order leases sign. H2 2027 delivery slots are finite.

FAQ

Does Stellenium offer wholesale colocation?

Yes. Stellenium leases dedicated data halls, suites, and multi-MW capacity in facilities it builds, powers, and operates, or delivers the same facility as a build-to-suit handover. First power is H2 2027.

How is wholesale capacity billed?

There is no fixed model. Leases can be priced all-in or as a reservation plus usage, tailored to each tenant's load profile and term.

What rack densities can Stellenium facilities support?

Facilities support 150 kW+ racks on 480 VAC or 800 VDC. Stellenium can deliver 800 VDC for racks built to NVIDIA Vera Rubin / OCP Mt. Diablo standards.

How large can a deployment be?

Deployments are sized to the load and scale from a single hall to a multi-building campus, with capacity phases matched to the tenant's ramp.

Who operates a Stellenium wholesale colocation facility?

Stellenium staffs and operates the facility 24/7/365, with SLA-backed capacity contracts, DCIM monitoring, remote hands on site, and one accountable team across the data hall and supporting power infrastructure.

What redundancy levels does Stellenium offer?

Redundancy is engineered from N through 2N, set by your SLA, with on-site battery storage providing load management and recovery margin.

How does Stellenium hold a delivery date when utilities are slipping?

The power strategy is selected per site: on-site generation sized to the load and scaled in modular blocks, grid supply where it fits, or a combination. The delivery plan is built around the tenant's schedule rather than depending solely on a utility interconnection queue, which for large new loads typically runs five to seven years.

What data center designs does Stellenium build?

Modular construction for rapid deployment or traditional construction, selected to your preferences, site conditions, SLA, density, and timeline. Designs span Tier II through Tier IV.

Who integrates the fuel, power, cooling, and IT systems on a Stellenium project?

Stellenium does. Stellenium is the systems integrator across all six systems: fuel supply, generation, electrical distribution, mechanical cooling, the building shell, and the IT load. Stellenium owns the interface specifications on both sides of every seam and runs Level 1 through Level 5 commissioning, ending with an integrated systems test at full simulated IT load.

Reserve capacity: contact@stellenium.com · https://stellenium.com/contact